PROFILE Started
in the year 2000, with the motto of bringing Global Standards to manufacture transformers
in the range of 11 to 132 kV. PRODUCT RANGE- Power Transformers
20,000 kVA of 132 kV class.
- Distribution Transformers 250 kVA and above.
- Furnace
Transformers.
- Rectifier Transformers.
- Booster Transformers
- Earthing
Transformers.
- Mining Transformers.
- Windmill Transformers.
QUALITY
ASSURANCE OF MATERIALSAll in coming materials are inspected to confirm
to the Company-National standards. QUALITY ASSURANCE OF PROCESSAt
every stage of manufacture, transformer is inspected to confirm to company quality
assurance program. During Manufacturing Process- Ratio and phase
angle error test before connections are brazed.
- Vector group test before
connections are brazed.
- Magnetic balance.
PRESSURE TESTBefore
dispatch all transformers are tested at specified pressure to ensure leak proof
joints. ROUTINE
TESTS(As per IS 2026:1997) Ratio : Winding resistance / OLTC M.B.B
Contacts checking Polarity : Open circuit test Phase angle error :
Short circuit & impudence test B.D.V of oil : Separate source voltage test I.R
values : Induced over voltage test Polarization Index : Vector group test Dielectric
discharge : Zero sequence Impedance test SPECIAL TESTSAll the design
are tested for heat run test. In house heat run test facility available up to
20,000 kVA. Oil test facilities like tan delta, Resistivity, Acidity, PPM and
suspended particles are available in house.
DESIGNTransformer
is designed for low losses. Selection of core material with low specific losses
and proper selection of conductor dimensions meet the goals. Tap turns are
distributed along the length instead of lumping at the center of winding to minimize
short circuit forces. Cooling ducts are dimensioned to limit hot spot temperature
of windings. At the same time winding spacers/blocks are dimensioned to limit
the stresses on windings due to short circuit forces. PROCESSINGHV
and LV Windings are dried by heating and pressed by hydraulic jacks to predetermined
short circuit forces. DRYINGCore and coil assembly is dried by
heating under vacuum in vacuum-drying oven controlled by PLC circuit. After the
assembly is dry, it is taken out of oven, windings are then clamped tight. The
assembly is housed into its tank and dry transformer oil is filled into it under
vacuum drying oven. OIL PROCESSINGOil is filtered through ultra
high Vacuum Filter Machine for limiting the moisture content to less than 5PPM. FABRICATIONTank,
cable boxes and core clamps are manufactured from weldable quality steel confirming
to Indian standards. Tanks are designed to withstand the hydraulic pressure
test prescribed in CBIP specifications. Clamps are designed to with stand forces
transmitted on to them by short circuit of windings. Cable boxes are designed
to facilitate easy connection of cables.
|